Image
IT Support Services

Design of medium voltage networks

For companies that own production facilities with an installed power exceeding 100kW, ARERA (or the manager/distributor?) grants the possibility of obtaining a delivery of electricity in Medium Voltage. The transition to medium voltage involves better management and distribution of electricity within the company as it allows the use of higher voltages for the machinery that can benefit from it and the scaling down to low voltage only where necessary. Likewise, both the energy distribution system and the connection to the grid must be redesigned to allow safe and efficient energy distribution. PTE ensures that it designs the network according to current legislation and draws up the Certification of Conformity, as well as offering to carry out the mandatory annual verification program for these types of systems.

Related experiences

Project

Consorzio Melinda

Underground warehouses lots 1 and 2

Project

Trentino Trasporti

Photovoltaic system Trentino Trasporti S.p.A.

Project

Comune di Pergine Valsugana

Municipal swimming pool photovoltaic system